Webb Dock No 3 Terminal
Taylor Rail Australia delivered the more complex ASC crane rail immediately adjacent to the wharf apron on the $100M upgrade.
Client: Symal
Location: Port of Melbourne
Duration: 2024
Value: $100m Upgrade (VICT)
Contract Type: Construct Only
As part of the $100 million Phase 3B upgrade at Victoria International Container Terminal (VICT) at Webb Dock, Taylor Rail was engaged by Symal in October 2024 to deliver the complex installation of crane rail infrastructure directly adjacent to the wharf apron. The project, due for completion in 2026, supports the expansion of terminal capacity through new yard blocks, truck lanes, Auto Stacking Cranes (ASCs), and Auto Container Carriers.
Key Achievements:
- Completed the Ship to Shore A120 Crane Rail installation in a fully operational port environment.
- Successfully re-staged landside and waterside rail works to align with the evolving civil construction program.
- Delivered crane rail works in compliance with international Salix/Gantrex supervisor specifications.
- Cored all hold-down bolt holes into existing concrete foundations.
- Welded and stressed all installed rails and completed final track certification.
We are an Australian based leader in rail construction and maintenance. Taylor Rail is ISO 45001:2018, ISO 14001:2015 and ISO 9001:2015 compliant and is accredited by the Office of the National Rail Safety Regulator (ONRSR) as a Rolling Stock Operator & is TAO accredited.