ARTC Level Crossings

Taylor Rail continues to make an impact on the level crossings project.

broken image

The Taylor Rail Crew completed multiple level crossings between Parkes, Quandialla and The Rock.

The works included:

  • Full depth reconditioning of level crossings up to 20m in length for dual track crossings
  • Civil drainage works completed
  • Track welding and adjusting
  • Track resurfacing
  • Guard rail installation
  • Asphalt level crossing installation with line markings
  • Pedestrian crossing installation with tactile indicators