The Taylor Rail Crew completed multiple level crossings between Parkes, Quandialla and The Rock. The works included:
- Full depth reconditioning of level crossings up to 20m in length for dual track crossings
- Civil drainage works completed
- Track welding and adjusting
- Track resurfacing
- Guard rail installation
- Asphalt level crossing installation with line markings
- Pedestrian crossing installation with tactile indicators