The scope of works for this project included:
- Removal of nine sidings (1300m track in total)
- Re-installation of 600m of track
- Extension of main siding by 300m
- Remove, refurbish and reinstall three turnouts
- Installation of concrete level crossing
- Resurfacing
- Recover all track components from removed sidings for re-use in upgrading works