Taylor Rail Australia consults with clients and advises on the most appropriate and effective solution, delivering services from design through to implementation, with a complete maintenance service for the life of the asset.

Our capabilities are both broad and dynamic.  Below are a list of recent projects, and the scope of works completed.  

 
BLUESCOPE STEEL RAIL RECONDITION
   
BLUESCOPE STEEL RAIL RECONDITION
 The scope of works for this recondition project included:
  • Removal of the existing track
  • Installation of new track formation
  • Installation of new sleepers
  • Welding
  • Resurfacing
PACIFIC NATIONAL YARD UPGRADE WORKS – TOWNSVILLE STUART DEPOT
   
PACIFIC NATIONAL YARD UPGRADE WORKS – TOWNSVILLE STUART DEPOT
The scope of works for this narrow gauge project included:
  • Supply and construction of 500m new track
  • Supply and construction 30m of concrete encased track
  • Construction and installation of 3 turnouts
  • Associated drainage & earthworks
  • Welding and adjustment of all track
  • Supply and install buffer stops
  • Resurfacing
ONESTEEL PORT EXPANSION – RAIL EXTENSION LEIGHTON CONTRACTORS
   
ONESTEEL PORT EXPANSION – RAIL EXTENSION LEIGHTON CONTRACTORS
The scope of works for this project included:
  • Supply and construction of 6.2km standard gauge track, 7 x turnouts
  • Supply and construction of 2 turnouts and 1.5km of 54T axle load standard gauge track for the Hot Metal Line
  • Supply and construction of 6.7km narrow gauge track, 2 x turnouts
  • Supply and construction of 450m of dual gauge track, 2 x diamonds and 2 x track splitters
  • Supply and construction of 180m tandem track on plastic sleepers
  • Flash butt welding, aluminothermic welding and track adjusting
  • Resurfacing
PLATEWAY – COBAR JOINT REMOVAL
   
PLATEWAY – COBAR JOINT REMOVAL
The scope of works for this project included:
  • Removal of 500 x joints
  • Weld and adjust track
  • Resleepering and retimbering of turnouts
  • Partial resleepering
  • Installation of level crossings
  • Resurfacing
BORAL SYDNEY AGGREGATES PROJECT – PEPPERTREE, MEDWAY & MALDON SITES
   
BORAL SYDNEY AGGREGATES PROJECT – PEPPERTREE, MEDWAY & MALDON SITES
The scope of works for Peppertree included:
  • Design, supply & construct 1.2km of new track for Balloon Loop
  • Design, supply & construct 1.2km of new track to South Marulan Quarry & install 2 new turnouts
  • Removal of 60 joints, weld and adjust track
  • Installing lubricator and friction modifier locations
  • Install “Armco” barrier ballast retaining walls at culvert
  • Resurfacing
The scope of works for Medway included:
  • Re-railing of 650m of track
  • Reconditioning of 170m of track
  • Design, supply and construction of 1.2km of track and associated drainage and earthworks
  • Supply and construction of new 2 turnouts
  • Removing and re-instate staff hut
  • Installation of 4 x 2.4m span box culvert on both tracks to replace the existing timber bridge
  • Removal of 30 x joints
  • Weld and adjust track
  • Install lubricators
The scope of works for Maldon included:
  • Extend siding by 173m
  • Re-railing through the proposed dump station
  • Extend embankment by 95m to accommodate the new trackwork
  • Construct new buffer stop
  • Weld and adjust track
  • Resurfacing
QUBE LOGISTICS – MINTO MAINTENANCE PIT
   
QUBE LOGISTICS – MINTO MAINTENANCE PIT
The scope of works for this project included:
  • Design and construction of maintenance pit, associated drainage and earthworks
  • Construct 50m new track
  • Aluminothermic welding
  • Installation of buffer stop
TRACK INSPECTION & MAINTENANCE
   
TRACK INSPECTION & MAINTENANCE
Taylor Rail Australia currently provides track inspection and maintenance services to numerous clients including:
  • Boral – NSW & Victoria
  • Perilya Mine, Broken Hill
  • Chicago Freight Car Leasing Australia – Goulburn
  • El Zorro – Carrington, Werris Creek, Portland
  • BlueScope – Acacia Ridge
  • Qube Logistics – Minto, Harefield, James Siding
  • Graincorp – Carrington & Port Kembla
  • Interail – Casino
  • Peabody Energy Australia – Helensburgh
MARITIME CONTAINER SERVICES – YARD UPGRADE WORKS
   
The scope of works for this project included:
  • Removal of nine sidings (1300m track in total)
  • Re-installation of 600m of track
  • Extension of main siding by 300m
  • Remove, refurbish and reinstall three turnouts
  • Installation of concrete level crossing
  • Resurfacing
  • Recover all track components from removed sidings for re-use in upgrading works
MACONNEL DOWEL JV QCLNG EXPORT PIPELINE – NARROWS CROSSING PROJECT
   
The scope of works for this project included:
  • Construction of 4.8km of narrow gauge timber track
  • Supply & construction of 60m of track direct fixed to concrete pad
  • Resurfacing
 
NSW HEAD OFFICE
10 Luso Drive, PO Box 373
Unanderra, NSW 2526
P +61 2 4272 1586
F +61 2 4272 1576
QUEENSLAND
Unit 3B, 1 Helium Street
Narangba, QLD 4504
P +61 7 3888 1740
F +61 7 3888 2954
 
HOME
OPERATE
DEMAND
EXCEL
LIFE
TEAM
CONTACT
© Taylor Rail Australia